Plant pre-start checklist template: what to check every shift

Last reviewed 29 October 2026 · Sources linked below · Written by Jay at Andwat Co, an Australian boilermaker/fabricator (Cert III Engineering, 12+ years in the trade). About

As an Amazon Associate I earn from qualifying purchases.

A practical plant pre-start checklist template for Australian sites: walk-around items for forklifts, EWPs, excavators and loaders, a defect tag-out snippet, and where to keep the records.

Most hire companies and civil sites will not let you start a forklift, EWP or excavator until a daily pre-start is filled in. Manufacturer checklists vary; the WHS duty is to make sure plant is safe to use. This page gives you a template structure you can print and adapt.

The short answer

Printable pre-start snippet (tick OK / FAULT / N/A)

Worked example – site forklift, Monday morning

Plant ID FLT-04 · hours 4,812 · operator Mia (LF ticket). Walk-around finds a weeping hydraulic fitting on the tilt ram → FAULT, red tag, entered in defect register, machine quarantined. Spare FLT-02 pre-started clean and used instead. Fitting replaced same day; FLT-04 cleared and returned to hire pool.

Track due dates for plant, lifting gear and test-and-tag in one place with the register below. For a bound book of 100 daily pages, keep printed sheets in a folder for now, or use a simple duplicate book from a stationery supplier. Our Plant Pre-Start Checklist Book is heading to Amazon KDP.

Handy tools (affiliate): digital multimeter for battery/charging checks, LED torch for under-machine inspections.

Quick answers

Is a pre-start legally required every day?

WHS laws require plant to be maintained and inspected so it stays safe. Daily pre-starts are the common way sites meet that duty and hire-company rules. Follow the manufacturer and your site procedure.

What if I find a fault mid-shift?

Stop, tag out, record it, and do not use the machine until a competent person clears it.

Can one checklist cover every machine type?

Use a common core (walk-around, fluids, brakes, e-stop) plus machine-specific items from the manufacturer for EWPs, excavators and cranes.

Where should records be kept?

On site for the current job, then filed by plant ID. A register of next-inspection due dates stops overdue gear staying on the floor.