Andwat Trade Guides

Electrical test and tag in Australia: intervals and what fab shops track

Last reviewed 28 October 2026 · Sources linked below · Written by Jay at Andwat Co, an Australian boilermaker/fabricator (Cert III Engineering, 12+ years in the trade). About

Plain-English guide to test and tag for Australian workshops: how AS/NZS 3760 intervals work by environment, who can test, what to put on the tag, and how it differs from plant and lifting gear inspections.

"Test and tag" is the common name for inspecting and testing electrical equipment, then fitting a tag with the test date and next due date. In Australia the technical detail sits in AS/NZS 3760 (in-service safety inspection and testing of electrical equipment). The WHS laws require you to manage electrical risk; the Standard is the usual way workshops set intervals.

The short answer

What actually gets tested in a fab shop

Fixed wired plant is a different inspection regime. Don't assume a welder's plug test covers the workshop sub-board.

Tag fields that matter

Questions the other guides don't answer

Do I need a licensed electrician?

AS/NZS 3760 talks about a competent person. Many fab shops use an external test-and-tag provider. Some principal contractors specify a licence class in the site rules – follow the stricter of the Standard and the site.

Is new equipment tagged out of the box?

Brand-new equipment is often put into service after a visual check and then enters the interval cycle. Some sites still insist on a formal first test. Check the site induction pack.

What about battery tools?

The removable battery pack and charger are the usual focus. Follow the manufacturer and the Standard's guidance for the class of equipment. Damaged packs are a fire risk – quarantine them.

Can the same register track lifting gear?

Yes as separate columns or sheets. No as one shared due date. See the plant and lifting gear inspection guide.

Quick answers

What Standard covers test and tag in Australia?

AS/NZS 3760 sets out in-service safety inspection and testing of electrical equipment, including suggested intervals by environment. Buy the current edition – summaries online can be out of date.

How often should workshop tools be tested?

AS/NZS 3760 uses shorter intervals for harsher environments. Factories and workshops are commonly around 6 months; construction sites around 3 months; office environments around 12 months. Confirm against the current Standard and your risk assessment.

Does test and tag have to be done by an electrician?

The Standard requires a competent person. That may or may not be a licensed electrician depending on training, the equipment and site or state requirements. Many workshops use a specialist provider.

What happens if a lead fails?

Remove it from service, quarantine it, and repair or dispose of it. Do not retag failed equipment as a pass.

Sources

Related guides

General information only, summarised from the official sources above as at the review date. It isn't legal, WHS or engineering advice. Rules change and your situation may differ, so check the source or ask a professional.